EnerPHit management plan
The RIBA Passivhaus Overlay, published by the RIBA in 2022, states in relation to the EnerPHit Management Plan: “This plan includes an assessment of retrofit strategy and certification strategy (single phase or step-wise), surveys to gather data about the existing building, and strategies to address the specific demands of the building and site. This whole building retrofit plan includes modelling the existing building in the Passivhaus Planning Package (PHPP) to provide detailed calculations of the existing fabric performance of the building. Importantly, all approaches to retrofit, including EnerPHit, require some augmentation to deliver robust solutions addressing all aspects of the retrofit performance gap and unintended consequences. Consider: energy use (e.g. CIBSE TM22), a BUS survey, dimensional, moisture, thermographic and air leakage, building condition. Where appropriate analyse data using metrics that map onto Passivhaus benchmarks. Integrate with moisture risk assessments.”
EnerPHit is the Passivhaus certificate for retrofits.
[edit] Related articles on Designing Buildings
Featured articles and news
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.